Ụlọ Ọrụ Ike Ike Jebba
Ebe a na-ahụ maka ọkụ eletrik Jebba, bụkwa ọdụ ọkụ Jebba, bụ ụlọ ọrụ ọkụ eletrik na-agafe osimiri Niger na Naijiria . Ọ nwere ike na-iche ike nke 578.4 megawatts, nke zuru ezu iji nwee ike izi ụlọ 364,000. Enyere ụlọ ọrụ ahụ ọrụ na 13 ika 1985, ọ bụ ihe na-egosi ike azụmahịa nke 1983. [1]
Ebe
dezieỌdụ ọkụ Jebba dị ihe dịka 100 kilometers (62 mi) mgbada mmiri mmiri Kainji, [1] na ihe dịka 40 kilometers (25 mi) southwest of Mokwa, obodo kacha nso.
Nke a dị ihe dịka 256 kilometers (159 mi) n'okporo ụzọ, southwest of Minna, isi obodo Niger State. [3] ndị ọkụ ọkụ ahụ dị n'ụsọ Niger na oke n'etiti Niger State na Kwara State, ihe dịka 91.5 kilometers (57 mi), n'okporo ụzọ, northeast Ilorin, isi obodo Kwara State. [4] Jebba Dam nọ ọdụ na elu nke 71.917 meters (236 ft) n'elu egwu oke osimiri.. [2]
Nchịkọta
dezieNdị ọrụ ọkụ, nke Gọọmenti etiti Naijiria nwe, nwere igwe ọkụ ọkụ ụgbọ isii, nke ọ gbara ikike nke 96.4 megawatts, maka oke arụnyere bụ 578.4 megawatts. Nkwe echiche maka ndị ọrụ na ọrụ n'ọdụ ọkụ a bụ Mainstream Energy Solutions Limited, ụlọ ọrụ ọkụ nwere onwe ya. Mainstream Energy na-ejide ikike ikike ahụ na ọdụ ọkụ Kainji Hydroelectric 760 megawatts, nke dị ihe dịka 100 kilometers (62 mi). mgbago elu nke ọkụ Jebba. [1] Ise n'ime ụgbọ ụgbọ dị, dịka nke Jenụwarị 2021. Ọgbọ nke isii ngwaọrụ ike ọrụ, ebe ọ bụ ọkụ mebiri ya na 2009 [3]
Ndozi na ndozigharị
dezieNa Jenụwarị 2021, Andritz AG, ụlọ ọrụ injinia Austrian, bụ Mainstream Energy nchọpụta ka ọ rụkwaa turbine nwere ike wee nwee ike n'ọdụ ọkụ ruo oke ike.
Ọrụ eletriki na-arụ ọrụ gụnyere: (a) nnọchi nke turbine 96.4 megawatts (b) ntinye nke generator 103MVA ọhụrụ (c) ntinye nke transformer ọhụrụ (d) ntinye nke mgbanaka n'èzí ọhụrụ na (e) ngbanwe nke ngwa ngwa., gụnyere ọnụ ụzọ mbata. [3] [4]
A na-atụ anya na nrụzi na nrụzi nke ahụ ga-eri ihe dịka NGN13.68 ijeri (US$36 nde ma ọ bụ €30million). A na-atụ anya na ọrụ nrụzigharị ga-adịgide ruo izu mbụ nke 2024. [3] [4]
Ntụaka
dezie- ↑ International Hydropower Association (December 2020). Our Member Organizations: Mainstream Energy Solutions Limited: Brief overview of the Kainji and Jebba Hydroelectric Power Plants: Jebba Hydroelectric Plant. International Hydropower Association. Retrieved on 30 January 2021.
- ↑ Olushola S.O. and Ehigiator–Irughe R. (1 March 2017). "Bathymetric and Volumetric Analysis of Jebba (Hydropower) Dam Harnessing its Capability for Multipurpose Use: Geographical Location of the Study Area". Nigerian Journal of Environmental Sciences and Technology 1: 111–122. DOI:10.36263/NIJEST.2017.01.0028.
- ↑ 3.0 3.1 3.2 ESI Africa (26 January 2021). Plans afoot to modernise generation unit at Nigerian hydro plant. ESI Africa. Retrieved on 30 January 2021. Kpọpụta njehie: Invalid
<ref>
tag; name "6R" defined multiple times with different content - ↑ 4.0 4.1 Chika Izuora (28 January 2021). Jebba Hydroelectric Power Plant To Gulp N13.68bn. Retrieved on 30 January 2021. Kpọpụta njehie: Invalid
<ref>
tag; name "7R" defined multiple times with different content